How to obtain permission to install and replace a gas boiler

After gas supply to a private home, the next task, as a rule, is the installation of gas equipment.

Requirements for installing a gas boiler

Many apartment owners also refuse central heating and prefer the autonomous option, wanting to save money and turn on and off the heating of the premises when they see fit. But in order for such heating to be safe and efficient, it is necessary to comply with the requirements for installing a gas boiler.

In the organizations that control gas supply, the necessary documents are drawn up and agreed upon both for connecting the gas main to the house and for installing heating units.

HOW TO REPLACE A GAS BOILER WITH A NEW one

It would seem that it could be simpler than replacing an already installed boiler with a new one. The design documentation has already been prepared, the specifications have been completed. But, not everything is so simple. The fact is that, according to existing requirements, replacement is equivalent to redevelopment of the premises and requires re-approval.

The re-registration process begins with an application for replacement submitted to the gas distribution organization.

To obtain technical specifications, you will need to submit the following documents:

  1. Documents evidencing ownership of the house and surrounding area.
  2. Passport.

After receiving the application, Gorgaz will put the boiler in the queue for shutdown. Further work is performed in the following order:

  1. Removing the old boiler.
  2. Obtaining technical specifications.
  3. Making a new project.
  4. Coordination of documentation and connection.

Replacing a boiler is faster and does not require the same financial costs as when connecting a gas boiler room for the first time.

Fines for changing independently without approval

Replacing a gas boiler in a private house without permission and without drawing up a project is prohibited by law - Art. 7.19 Code of Administrative Offenses of the Russian Federation “Unauthorized connection and use of electrical, thermal energy, oil or gas.” The fine ranges from 10 to 15 thousand rubles; in the event of an emergency, criminal liability is possible.

The replacement may be discovered during the next scheduled inspection: at a minimum, the boiler passport will not have a stamp indicating that specialists have carried out commissioning work. Then the gas distribution company terminates the contract, disconnects the house from the gas main, and imposes penalties.

However, in most cases, gas workers do not pay attention to the changes made or turn a blind eye even to serious violations; it is often possible to reach an agreement with the workers. Many owners of private houses, especially in rural areas, actively use loyalty, but what works today can be interrupted tomorrow, and it is impossible to legitimize an already installed gas boiler. Therefore, despite the huge bureaucracy, we recommend that you initially arrange a replacement in accordance with all the rules, especially since the process can be entrusted to specialists for relatively little money.

IS IT POSSIBLE TO REPLACE THE GAS BOILER YOURSELF?

It is impossible to replace a gas boiler yourself, without contacting regulatory organizations, and is punishable by a fine. In practice, a large number of owners of private houses still change their boiler equipment without approval.

After violations are identified, they simply pay a fine and pay for the production of a new project. Provided that the power of the thermal unit has not been changed upward, usually no approval will be required. Legalizing a replacement is often easier than completing all the documents in accordance with current legislation.

IS A NEW PROJECT NEEDED WHEN REPLACING A GAS BOILER

The project specifies the model, type and power of the heating unit. In addition, each boiler has its own serial number, indicated in the technical passport and included in the project documentation. Therefore, when replacing, you will need to make a new project indicating new data.

You must go through the following registration steps again:

  • Obtain technical specifications for replacing a gas boiler. At this stage, the gas distribution company can change the performance of the unit based on the actual living area of ​​the house.
  • Make a new project.
  • Obtain approval by providing a gas distribution project, technical specifications, and the results of checking the chimney duct.
  • Replace the old unit with a new one.

When replacing an old gas boiler with a new one, the following documents are needed:

  • Passport.
  • Documents of the owner of the residential premises.
  • Technical passport for gas equipment.
  • Technical conditions.

Standard prices for replacing already installed gas equipment are 1000-1500 rubles, depending on the region.

Regulatory documentation for replacement


The master will not be able to perform dismantling if there are no relevant documents

AOGV and AGV boilers can only be changed with the consent of the relevant authorities, since people’s lives depend on the correct performance of the work. For this reason, this should only be done by specialists.

It is unacceptable to make an unauthorized replacement, but dismantling can be done with your own hands; these requirements are outlined in clause 5.5.2 of Resolution No. 170 of the Gosstroy of Russia.

The property owner must first complete the following documents:

  1. Certificate for the boiler, which must meet Russian requirements for safe operation.
  2. Inspection report for indoor smoke ventilation systems.
  3. Technical passport and factory operating instructions for the unit.
  4. Reconstruction project for a gas boiler installation system.
  5. For a double-circuit model, a sanitary and hygienic certificate for the hot water system will be required.
  6. Once all the listed materials have been prepared, you can transfer them to the appropriate gas department to obtain a permit to operate new gas equipment.

IS IT POSSIBLE TO REPLACE A GAS BOILER WITH AN ELECTRIC BOILER?

Replacement is quite possible, but for this you will have to obtain permission from another organization involved in electricity supply. Documents are needed only if the electric boiler has a power of more than 8 kW. Up to this performance limit, the unit belongs to ordinary household water heating devices of the boiler type, therefore, it is installed without permits or approvals.

For productive electric boilers, a separate power supply line will be required. You will need to make a project and obtain permission to increase the amount of electricity allocated. Separately, you need to write a statement about disconnecting the gas boiler from the main line.

ARE THERE PENALTIES FOR INSTALLING OR REPLACING A BOILER WITHOUT A PERMIT?

Installing a boiler without permission is a strict violation of existing standards and is equivalent to redevelopment of a residential premises. This omission is punishable by penalties imposed after they are identified during the next inspection by gas workers.

Serious violations lead to gas supply being cut off. After paying the imposed fines and correcting the identified defects, the equipment is allowed to be put into operation again.

Request a call

Call around the clock, we work without holidays and weekends.8 495 744 67 74

Our contact page

The emergency service operates around the clock in Moscow and the Moscow region. Departure to the nearest areas is planned according to the schedule.

In which houses can we talk about organizing autonomous heat supply?

The installation of individual heating boilers is widely practiced at low-rise individual sector facilities and in individual low-rise apartment buildings not connected to centralized heating networks.

To initially understand the possibility of organizing individual heat supply in an apartment building, the following features should be taken into account:

  • The type of heat supply organized in the house in which the owner lives (centralized heat supply from a combined heat and power plant (CHP), an autonomous boiler house;
  • Availability of centralized gas supply in the house;
  • Technical solution for the heat supply system (individual apartment-by-apartment connection to heating networks with an installed metering unit for consumed heat, connection through an interfloor riser);
  • Coolant supply system (from the upper floors to the lower ones, from the lower floors to the upper ones);
  • Number of floors of apartment buildings;
  • Features of ventilation systems;
  • Technical feasibility of installing gas heating equipment in accordance with the requirements of SNiPi SP (a room of at least 4 m2, with a window, a ventilation system, not used as a living space (boiler, kitchen).

Heating a house 100 m²

Really, honestly, really

Heating a house 100 m² fromRUR 49,500
Installation of heating boiler8,000 rub.
Installation of heating radiators (no more than 10 pieces)!!! The cost of installing a standard (mounted, not in-floor convector) heating radiator is 4,000 rubles 25,000 rub.
Radiator pipe routing12,000 rub.
Pressure testing and filling with coolant4,500 rub.
TOTAL turnkey:RUB 49,500
Drilling holes, rigging, dismantling, paid extraaccording to_estimate

Heating a house 100 m² Attention. This cost is a preliminary estimate; these prices should only be used as approximate prices. The exact cost of the work is calculated after an engineer visits the work site, its complexity, and quantity.

Cost of materials from 120,000 rubles

Included by type of work

Boiler installationInstalling an electric boiler on a wall or floor
Installation of pipes without “grooving”Open pipeline installation with wall or floor mounting
heating radiatorsMounting the heating device on the wall, installing fasteners
System pressure testingPressure testing of the assembled system with an air compressor to identify possible leaks
Commissioning worksFilling with coolant (antifreeze or water), removing air from the heating system during work
!!! No heated floors It is calculated additionally, it requires coordination of the type of substrate for the pipes, the type of use of the pipe, the possibility of control and automatic control, and of course the footage
!!! Without external chimney To calculate the cost, an engineer’s visit is required, an inspection of the roof structure, window location and much more.

House heating

Samples of SRO approval

SRO approval with an extract from Rostechnadzor, an application with types of work, an insurance policy and an ISO certificate (if necessary).

1012 Granted permits in 2020

Heating a house 150 m² - 52,500 rub.

Really, honestly, really

Heating of a house 150 m² fromRUB 52,500
Installation of heating boiler8,000 rub.
Installation of heating radiators (no more than 10 pieces)!!! The cost of installing a standard (mounted, not in-floor convector) heating radiator is 4,000 rubles 25,000 rub.
Radiator pipe routing15,000 rub.
Pressure testing and filling with coolant4,500 rub.
TOTAL turnkey:RUB 52,500
Drilling holes, rigging, dismantling, paid extraaccording to_estimate

Heating a house 150 m² Attention. This cost is a preliminary estimate; these prices should only be used as approximate prices. The exact cost of the work is calculated after an engineer visits the work site, its complexity, and quantity.

Cost of materials from 200,000 rubles

Included by type of work

Boiler installationInstalling an electric boiler on a wall or floor
Installation of pipes without “grooving”Open pipeline installation with wall or floor mounting
heating radiatorsMounting the heating device on the wall, installing fasteners
System pressure testingPressure testing of the assembled system with an air compressor to identify possible leaks
Commissioning worksFilling with coolant (antifreeze or water), removing air from the heating system during work
!!! No heated floors It is calculated additionally, it requires coordination of the type of substrate for the pipes, the type of use of the pipe, the possibility of control and automatic control, and of course the footage
!!! Without external chimney To calculate the cost, an engineer’s visit is required, an inspection of the roof structure, window location and much more.

House heating

Heating a house 200 m² - 72,500 rub.

Really, honestly, really

Heating a house 200 m² fromRUB 72,500
Installation of heating boiler8,000 rub.
Installation of heating radiators (no more than 15 pieces)!!! The cost of installing a standard (mounted, not in-floor convector) heating radiator is 4,000 rubles 35,000 rub.
Radiator pipe routing25,000 rub.
Pressure testing and filling with coolant4,500 rub.
TOTAL turnkey:RUB 72,500.
Drilling holes, rigging, dismantling, paid extraaccording to_estimate

Heating a house 200 m² Attention. This cost is a preliminary estimate; these prices should only be used as approximate prices. The exact cost of the work is calculated after an engineer visits the work site, its complexity, and quantity.

Cost of materials from 250,000 rubles

Detailed estimate for installation of heating system

Included by type of work

Boiler installationInstalling an electric boiler on a wall or floor
Installation of pipes without “grooving”Open pipeline installation with wall or floor mounting
heating radiatorsMounting the heating device on the wall, installing fasteners
System pressure testingPressure testing of the assembled system with an air compressor to identify possible leaks
Commissioning worksFilling with coolant (antifreeze or water), removing air from the heating system during work
!!! No heated floors It is calculated additionally, it requires coordination of the type of substrate for the pipes, the type of use of the pipe, the possibility of control and automatic control, and of course the footage
!!! Without external chimney To calculate the cost, an engineer’s visit is required, an inspection of the roof structure, window location and much more.

Heating a house 250 m² - 87,500 rub.

Really, honestly, really

Heating of a house 250 m² fromRUB 87,500
Installation of heating boiler8,000 rub.
Installation of heating radiators (no more than 20 pcs)!!! The cost of installing a standard (mounted, not in-floor convector) heating radiator is 4,000 rubles 45,000 rub.
Radiator pipe routing30,000 rub.
Pressure testing and filling with coolant4,500 rub.
TOTAL turnkey:87,500 rub.
Drilling holes, rigging, dismantling, paid extraaccording to_estimate

Heating a house 250 m² Attention. This cost is a preliminary estimate; these prices should only be used as approximate prices. The exact cost of the work is calculated after an engineer visits the work site, its complexity, and quantity.

Cost of materials from 300,000 rubles

Included by type of work

Boiler installationInstalling an electric boiler on a wall or floor
Installation of pipes without “grooving”Open pipeline installation with wall or floor mounting
heating radiatorsMounting the heating device on the wall, installing fasteners
System pressure testingPressure testing of the assembled system with an air compressor to identify possible leaks
Commissioning worksFilling with coolant (antifreeze or water), removing air from the heating system during work
!!! No heated floors It is calculated additionally, it requires coordination of the type of substrate for the pipes, the type of use of the pipe, the possibility of control and automatic control, and of course the footage
!!! Without external chimney To calculate the cost, an engineer’s visit is required, an inspection of the roof structure, window location and much more.

Heating a house 250 m²

8 [email protected] ROUND THE CLOCK

Russia, Moscow, ☞ Pyatnitskoe highway, 55A Russia, Moscow, Mitino, ☞ 3 Mitinsky lane, 1 (ARCHIVE) Russia, Moscow, ☞ Yana Rainis boulevard, 19, cor. 1 Russia, Moscow, ☞ Marina Raskova, 10 kor. 4 Russia, Moscow, ☞ 1st Grayvoronovsky proezd, 2A Russia, Volokolamsk, ☞ Novo-Soldatskaya street, 23с3 Russia, Golitsino, ☞ Petrovsky pr., vl 5 с 1 Russia, Elektrougli, ☞ st. Central, 50 Russia, Klin, ☞ Moskovskaya st., 31 Russia, Konakovo, ☞ Lenina, 7A Russia, Podolsk, ☞ st. Fedorova, 19 Russia, Tula region, ☞ Plavsk Russia, Chelyabinsk, ☞ Komsomolsky pr-t, 2, kor. 315 Russia, Ramensky urban district, ☞ Chulkovo village Russia, Republic of Crimea, Yalta urban district, urban settlement ☞ Beregovoye

Registration of hazardous production facilities (hazardous production facilities) in Rostechnadzor

To register objects in the state register of organizations operating these objects, no later than 10 working days from the date of commencement of their operation

submit information characterizing each object to the registration authority. This does not mean the actual start of operation of the facility, but obtaining permission to put the facility into operation, formalizing a decision on putting pressure equipment into operation, etc.

To compile Information characterizing each facility, the operating organization is obliged to carry out the procedure for identifying hazardous production facilities

, in which all quantitative and qualitative characteristics of objects, all dangerous factors must be identified.
The following documents are considered for identification:

  • design documentation;
  • justification for the safety of a hazardous production facility (if such a justification has been developed);
  • industrial safety declaration (if developed);
  • technological regulations;
  • master plan for the location of buildings and structures;
  • information about the technologies used in main and auxiliary production;
  • specification of installed equipment;
  • documentation for technical devices used at the facility (passports, operating manuals, permits);
  • data on the amount of hazardous substances that are or may be present at the facility at the same time.

List of documents for submission to Rostechnadzor

To register a hazardous production facility, the operating organization submits the following documents to the territorial department of Rostechnadzor to find the legal address of the organization:

  • Application (sample, application form for registration of a public organization);
  • Information characterizing the hazardous production facility (in 2 copies for each object, sample, form of Information characterizing the hazardous production facility);
  • Power of attorney for a representative of the organization (original and copy);
  • Inventory of documents (inventory form);
  • Copies of documents confirming the existence of
    hazardous production facilities, including land plots, buildings, structures and structures, under the right of ownership and use
  • Copies of documents containing justification for the safety of the hazardous production facility (if any), indicating the details for registering a positive conclusion from the industrial safety and industrial safety standards;
  • Copies of documents that contain the text part of the “Technological Solutions” subsection of the design documentation (documentation) for capital construction projects
    (indicating the details of the conclusion of the relevant examination).

Before registering a public utility, some technical devices must be registered

in the bodies of Rostechnadzor, and in the Information characterizing the hazardous production facilities, register the accounting (registration) numbers of the technical specifications. Such devices include lifting structures, vessels and pressure boilers.

Exclusion of public benefit organizations from the register

To exclude a hazardous production facility from the state register in the event of its liquidation or decommissioning, or loss of signs of danger, it is necessary to submit an application (with an inventory and a power of attorney) to the registering authority, attaching documents confirming:

  • liquidation of an object or its decommissioning (acts of dismantling, acts of conservation, degassing, etc.);
  • loss by the object of the danger signs specified in Appendix 1 to the Federal Law “On Industrial Safety of Hazardous Production Facilities”.

For example, on September 1, 2016, amendments to 116-FZ came into force (Federal Law No. 170-FZ of June 2, 2016), according to which hazardous production facilities do not include facilities operating under pressure of natural gas or liquefied petroleum gas up to 0.005 megapascal inclusive of gas distribution networks and gas consumption networks. Thus, all facilities (boiler houses, etc.) that circulate gas with a pressure of less than 0.005 megapascal, inclusive, are subject to exclusion from the register of hazardous production facilities

Rostechnadzor.

Making changes to the register of hazardous production organizations

The operating organization is obliged, within 10 working days from the date of occurrence of the following changes, to submit to the registering authority an application (by power of attorney and inventory) with documents confirming the presence of changes:

  • change in the composition of hazardous materials – quantitative and qualitative characteristics (replacement of technical specifications, change in the amount of hazardous substances, etc.);
  • change of address of the public organization;
  • change in information about the operating organization (change of name, etc.) or change in information about the owner of the facility;
  • change of owner of the hazardous production facility - operating organization.

For example, Federal Law No. 22-FZ of February 22, 2017 “On Amendments to the Federal Law “On Industrial Safety of Hazardous Production Facilities” regarding the assignment of a hazard class to gas stations intended for refueling vehicles with natural gas

. Now organizations that have assigned hazard class III to these objects must go through the re-registration (amendment) procedure and change the hazard class of the object from III to IV.

Boiler room maintenance cost

Technical (service) maintenance of the boiler room

Name of worksVolumePrice
Service contract for floor-standing boiler (gas, diesel) up to 60 kWwith 1st scheduled departurefrom 14 000 ₽
Service contract for floor-standing boiler (gas, diesel) from 60 to 170 kWwith 1st scheduled departurefrom 20 000 ₽
Service contract for floor-standing boiler (gas, diesel) up to 60 kWwith 2 scheduled tripsfrom 22 000 ₽
Service contract for floor-standing boiler (gas, diesel) from 60 to 170 kWwith 2 scheduled tripsfrom 30 000 ₽
Service contract for wall-mounted gas boilerwith 1st scheduled departurefrom 10 000 ₽
Service contract for wall-mounted gas boilerwith 2 scheduled tripsfrom 15 000 ₽
The exact cost is calculated after check-outengineer

Attention. This cost is a preliminary estimate; these prices should only be used as approximate prices. The exact cost of the work is calculated after an engineer visits the work site, its complexity, and quantity.

Boiler room repair, diagnostics and prevention

Name of worksVolumePrice
On-site inspection and diagnostics (without repair)up to 50 km from MKADfrom 3,500 ₽
On-site inspection and diagnostics (without repair)from 50 to 100 km from MKADfrom 5,500 ₽
Cleaning the burner (atmospheric)power up to 60 kWfrom 2,000 ₽
Cleaning the burner (supercharged)power up to 60 kWfrom 3,500 ₽
Cleaning the burner (atmospheric)power from 60 to 170 kWfrom 8,500 ₽
Cleaning the boiler combustion chamberpower up to 60 kWfrom 4,000 ₽
Cleaning the boiler combustion chamberpower from 60 to 170 kWfrom 6,000 ₽
Checking and pumping up pressure in the expansion tankwithout dismantling workfrom 2,500 ₽
Checking and pumping up pressure on the expansion tankwith dismantling and installationfrom 4 500 ₽
Refilling the heating system with a pumpsystem volume up to 200 litersfrom 3 000 ₽
Replacement of heating element, pump, heat exchanger, with coolant drainfor a unitfrom 3 000 ₽
Conversion of a gas boiler to liquefied gasfor a unitfrom 3 000 ₽
Burner settingsgas / dieselfrom 2 500 ₽
The exact cost is calculated after check-outengineer

Attention. This cost is a preliminary estimate; these prices should only be used as approximate prices. The exact cost of the work is calculated after an engineer visits the work site, its complexity, and quantity.

Requirements for chimney installation

When installing a gas boiler of any type in an apartment in an apartment building, the chimney cannot be made narrower than its outlet pipe. If the device has an open combustion chamber and a power of no more than 30 kW, the cross-section of the chimney pipe cannot be less than 140 millimeters, and with a productivity of 40 kW - 160 millimeters in diameter.

If the boiler has a closed combustion chamber, it is equipped with a coaxial chimney with a cross-sectional size recommended by the manufacturer.

Next you need to adhere to the following rules:

  • the pipe going upward from the wall-mounted gas unit must have a length of at least 50 centimeters, and only then can the elbow be installed;
  • more than three bends cannot be created along the entire length of the chimneys;
  • combustion products from appliances with open combustion chambers are removed into the chimney, and with closed ones, also into the chimney or through the wall directly to the street (the method depends on the project).

Cost of installing boiler equipment

Installation

Solid fuel boiler (15% of the boiler cost) no lessPCfrom 10 000 ₽
Floor-standing gas/diesel boiler (15% of the cost of the boiler) no lessPCfrom 10 000 ₽
Pellet boiler (10% of the cost of the boiler) no lessPCfrom 15,000 ₽
Wall-mounted single-circuit boiler up to 30 kWPCfrom 9 000 ₽
Wall-mounted 2-circuit boiler up to 30 kWPCfrom 10 000 ₽
Pump (D, up to DN 32)PCfrom 3 150 ₽
Pump group (pump, shut-off valve assembly)PCfrom 2 500 ₽
Expansion tank for heating system (up to 100 l.)PCfrom 2 500 ₽
3-way valve (D, up to 1 1/4″)PCfrom 2500 ₽
3-way valve mixer servo drive (D, up to 1 1/4″)PCfrom 3 150 ₽
Chimney (D, up to 250 mm.)m/linearfrom 2,500 ₽
Boiler (water heater, up to 200 l.)PCfrom 8 500 ₽
Boiler (water heater, up to 500 l.)PCfrom 10,000 ₽
Boiler safety groupsPCfrom 2 250 ₽
Water Heater Safety GroupsPCfrom 2 250 ₽
Boiler manifoldPCfrom 5,500 ₽
Hydraulic separatorPCfrom 2,500 ₽
Heated floor temperature control groups (thermostatic valve, thermostat with clamp-on sensor, bypass valve, starter)PC3 750 ₽
Fuel tank connectionPC5 000 ₽
Fuel filter installationPC2 000 ₽
Air vent, thermometer, pressure gauge per unitPC650 ₽
Ball valve, mud filter, check valvePC500 ₽
Check the cost by phone:84957446774

Attention. This cost is a preliminary estimate; these prices should only be used as approximate prices. The exact cost of the work is calculated after an engineer visits the work site, its complexity, and quantity.

Commissioning works

Commissioning of a wall-mounted gas boilerPCfrom 10 000 ₽
Commissioning of boiler house up to 60 kW (protherm, ferroli, baxi, dakon)PCfrom 14,000 ₽
Commissioning of boiler house up to 60 kW (Vaillant, Viessmann, Buderus)PCfrom 18,000 ₽
Commissioning of boiler house from 70 to 120 kW (protherm, ferroli, baxi, dakon)PCfrom 20,000 ₽
Commissioning of a boiler house from 70 to 170 kW (Vaillant, Viessmann, Buderus)PCfrom 25,000 ₽
Commissioning of a cascade boiler house (2 boilers or more)PCfrom 30,000 ₽
Commissioning of electric boiler up to 6 kWPCfrom 7 000 ₽
Commissioning of electric boilers from 8 to 30 kWPCfrom 8 500 ₽
Commissioning of a pellet boiler up to 50 kWPCfrom 14 000 ₽
Commissioning of pellet boiler from 60 kW to 100 kWPCfrom 18,000 ₽
Commissioning of a boiler room with a pellet boiler up to 60 kWPCfrom 20,000 ₽
Check the cost by phone: 8 495 744 67 74_____________
The exact cost is calculated after receiving the technical_tasks_

Attention. This cost is a preliminary estimate; these prices should only be used as approximate prices. The exact cost of the work is calculated after an engineer visits the work site, its complexity, and quantity.

Rating
( 2 ratings, average 4.5 out of 5 )
Did you like the article? Share with friends:
For any suggestions regarding the site: [email protected]
Для любых предложений по сайту: [email protected]