If you are planning to begin installing a new heating system in a private home, then before you begin making calculations, as well as purchasing the necessary equipment and consumables, you need to find out what documents you will need to obtain allowing you to begin carrying out the planned work. Therefore, let us immediately note the main regulations governing the installation of an individual heating system:
- Resolution No. 307 “Procedure for connecting to the heat supply system”, which clearly describes the technical parameters of boilers that can be used for operation in heating systems of apartments or private houses.
- The Law “On Heat Supply”, the document contains applications regulating the installation of heating systems with restrictions and regulations.
Which is better: gas or electric boiler?
In terms of fuel cost, the most profitable option is gas. ... In terms of the cost of the equipment itself, electric boilers are cheaper - compared to domestic gas boilers by about 30-40%, and compared to foreign ones - by 300%. Installation and further maintenance costs are higher for gas boilers, i.e.
Interesting materials:
Why is mineral water or drinks better at quenching thirst than pure water? Why does water collect on plastic windows? Why is there no hot water coming from the boiler? Why doesn't water fill the toilet tank? Why doesn't the water in the Yenisei freeze? Why can't you swim in rusty water? Why can't you jump into water from a great height? Why can't you extinguish oil with water? Why doesn't the new gas water heater heat the water? Why did the water in the pond turn green?
Documents required when installing a boiler running on natural gas
- You will need to obtain a technical specification (TU) from the gas service at your place of residence. TU is issued upon presentation of a document that certifies the right to ownership of real estate, a copy of the BTI technical passport, a special permit issued by the architectural and planning department, a passport, and an INN.
- Please note that the specifications may have some differences in their content, depending on the specific purpose of the object where heating is planned, location, and intensity of use. You can receive the technical specifications within a month from the date of application.
- In addition, it may be necessary to prepare a topographic survey of the land plot on which the object is located.
- Project documentation for gas supply is being prepared. This stage of work can be done independently or with the help of specialists. The prepared project must be approved by the gas service at the place of residence.
- If the gas pipeline will pass through the territory of neighbors, you will need to obtain written permission from them.
- You will also need to prepare documents for the equipment (boiler) that is planned to be installed and an inspection report for the chimney system.
- After installation, you will need to receive documents on commissioning of the heating system; the period for receiving them is no more than 30 working days. Based on the documents received, gas service technicians will insert the system into the gas main, seal the metering system (gas meter), and prepare new documents for organizing gas supplies.
MFC of municipal districts of the Omsk region
MFC | Azov German national district of the Omsk region" 646880, Omsk region, Azov district, village. Azovo, pl. Vozrozhdeniye, 3 Help desk phone number and pre-registration +7 (38141) 2-38-00 |
MFC | Bolsherechensky district of the Omsk region" 646670, Omsk region, Bolsherechensky district, r.p. Bolsherechye, st. Sovetov, 52 Help desk phone number and pre-registration +7 (38169) 2-11-33 |
MFC | Bolsheukovsky district of the Omsk region" 646380, Omsk region, Bolsheukovsky district, village. Bolshiye Uki, st. Lenina, 6 Help desk phone number and pre-registration +7 (38162) 2-10-12 |
MFC | Gorkovsky district of the Omsk region" 646600, Omsk region, Gorkovsky district, Gorkovskoye village, st. Lenina, 13A Help desk phone number and pre-registration +7 (38157) 2-23-93 +7 (38157) 2-10-70 |
MFC | Znamensky district of the Omsk region" 646550, Omsk region, Znamensky district, village. Znamenskoye, st. Proletarskaya, 2B Help desk phone number and pre-registration +7 (38179) 2-19-57 |
MFC | Isilkulsky district of the Omsk region" 646024, Omsk region, Isilkulsky district, Isilkul, st. Kommunisticheskaya, 14 Help desk phone number and pre-registration +7 (38173) 2-14-30 +7 (38173) 2-02-04 |
MFC | Kalachinsky district of the Omsk region" 646900, Omsk region, Kalachinsky district, Kalachinsk, Lenin st., 49 Help desk phone number and pre-registration +7 (38155) 2-37-91 |
MFC | Kolosovsky district of the Omsk region" 646350, Omsk region, Kolosovsky district, village. Kolosovka, st. Kirova, 1 Help desk phone number and pre-registration +7 (38160) 2-13-51 |
MFC | Kormilovsky district of the Omsk region" 646970, Omsk region, Kormilovsky district, r.p. Kormilovka, st. Lenina, 47 Help desk phone number and pre-registration +7 (38170) 2-17-68 |
MFC | Krutinsky district of the Omsk region" 646130, Omsk region, Krutinsky district, urban settlement Krutinka, st. Kooperativnaya, 15 Help desk phone number and pre-registration +7 (38167) 2-25-50 |
MFC | Lyubinsky district of the Omsk region" 646160, Omsk region, Lyubinsky district, r.p. Lyubinsky, st. Pochtovaya, 8A Help desk phone number and pre-registration +7 (38175) 2-11-41 |
MFC | Maryanovsky district of the Omsk region" 646040, Omsk region, Maryanovsky district, r.p. Maryanovka, st. Lenina, 6 Help desk phone number and pre-registration +7 (38168) 2-24-57 |
MFC | Moskalensky district of the Omsk region" 646070, Omsk region, Moskalensky district, r.p. Moskalenki, st. Komsomolskaya, 72 Help desk phone number and pre-registration +7 (38174) 2-13-01 |
MFC | Muromtsevsky district, Omsk region" 646430, Omsk region, Muromtsevsky district, r.p. Muromtsevo, st. Krasnoarmeyskaya, 1 Help desk phone number and pre-registration +7 (38158) 2-30-51 +7 (38158) 2-30-90 |
MFC | Nazyvaevsky district of the Omsk region" 646100, Omsk region, Nazyvaevsky district, Nazyvaevsk, Proletarskaya st., 66 Help desk phone number and pre-registration +7 (38161) 2-25-23 |
MFC | Nizhneomsky district of the Omsk region" 646620, Omsk region, Nizhneomsky district, village. Nizhnyaya Omka, st. Lenina, 83 Help desk phone number and pre-registration +7 (38165) 2-16-89 |
MFC | Novovarshavsky district of the Omsk region" 646830 Omsk region, Novovarshavsky district, r.p. Novovarshavka, st. Krasny Put, 57 Help desk phone number and pre-registration +7 (38152) 2-13-69 |
MFC | Odessa district, Omsk region" 646860, Omsk region, Odessa district, village. Odesskoe, st. Lenina, 41 Help desk phone number and pre-registration +7 (38159) 2-12-77 |
MFC | Okoneshnikovsky district of the Omsk region" 646940, Omsk region, Okoneshnikovsky district, r.p. Okoneshnikovo, st. Gagarina, 34 Help desk and appointment phone number +7 (38166) 2-19-45 |
MFC | Omsk district, Omsk region" 644047, Omsk, st. Arkticheskaya, 37 Help desk phone number and pre-registration +7 (3812) 21-33-70 |
MFC | Pavlogradsky district of the Omsk region" 646760, Omsk region, Pavlogradsky district, r.p. Pavlogradka, st. Green, 10 Help desk phone number and pre-registration +7 (38172) 2-33-55 +7 (38172) 2-30-25 |
MFC | Poltava district, Omsk region" 646740, Omsk region, r.p. Poltavka, st. 1st Vostochnaya, 2 Help desk phone number and pre-registration +7 (38163) 2-40-36 |
MFC | Russko-Polyansky district of the Omsk region" 646780 Omsk region, Russko-Polyansky district, village. Solnechnoe, st. Sovkhoznaya, 61 Help desk phone number and pre-registration +7 (38156) 2-31-81 |
MFC | Sargatsky district of the Omsk region" 646400, Omsk region, Sargatsky district, r.p. Sargatskoye, st. Oktyabrskaya, 12A Help desk phone number and pre-registration +7 (38178) 2-10-80 tel\fax: +7 (38178) 2-14-61 |
MFC | Sedelnikovsky district of the Omsk region" 646480, Omsk region, Sedelnikovsky district, village. Sedelnikovo, st. 40 years of Komsomol, 2B Help desk phone number and pre-registration +7 (38164) 2-11-55 |
MFC | Tavrichesky district of the Omsk region" 646800, Omsk region, Tavrichesky district, r.p. Tavrichesky, st. Lenina, 51A Help desk phone number and pre-registration +7 (38151) 2-19-50 +7 (38151) 2-45-41 |
MFC | Tara district of the Omsk region" 646530, Omsk region, Tara district, Tara, st. Lenina, 68B Help desk phone number and pre-registration +7 (38171) 2-13-08, 2-13-03 |
MFC | Tevrizsky district, Omsk region" 646560, Omsk region, Tevrizsky district, r.p. Tevriz, st. Sovetskaya, 10 Help desk phone number and pre-registration +7 (38154) 2-15-03 |
MFC | Tyukalinsky district of the Omsk region" 646330, Omsk region, Tyukalinsky district, Tyukalinsk, st. Lenina, 9 Help desk phone number and pre-registration +7 (38176) 2-62-69 +7 (38176) 2-63-42 |
MFC | Ust-Ishimsky district of the Omsk region" 646580, Omsk region, Ust-Ishimsky district, village. Ust-Ishim, st. Gorkogo, 3A Help desk phone number and pre-registration +7 (38150) 2-13-03 +7 (38150) 2-20-22 |
MFC | Cherlaksky district of the Omsk region" 646250, Omsk region, Cherlaksky district, r.p. Cherlak, st. Melnikova, 98 Help desk phone number and pre-registration +7 (38153) 2-15-61 |
MFC | Sherbakulsky district of the Omsk region" 646700, Omsk region, Sherbakulsky district, r.p. Sherbakul, pl. Gurtieva, 60 Help desk phone number and pre-registration +7 (38177) 2-36-09 |
Installation rules and requirements
Electric boilers are compact in size, require a minimum of wiring and have a modern design, which allows them to be installed anywhere.
All general requirements are described in the PUE (7th edition). Electric boilers with a power of up to 10 kW do not require approval from the Energonadzor services. However, if you want to install a meter that differentiates electricity consumption by zone of the day, which we recommend doing in order to save money, you will still have to coordinate the installation. For boilers with a power of more than 6 kW, three-phase power supply (380 V) is required; 8-12 kW models can operate from a single-phase (220 V) network, but it will not provide operation at full power.
The choice of installation location for an electric boiler is more extensive than for gas or solid fuel boilers. Electric boilers can be installed in a residential area, for example, a corridor, hallway or kitchen, but keep in mind that in any case you need to run pipelines, wiring, grounding and other communications to it. The installation of an electric boiler in the bathroom and toilet is prohibited.
The requirements for the installation surface are also minimal, it can also be a wooden wall, but in this case it is necessary to insulate the installation site with a layer of non-combustible material (basalt cardboard, xylolite sheet).
Fireproof protective plate when installing an electric boiler on a wooden surface.
Manufacturers also impose requirements on the space around the electric boiler necessary to ensure maintenance and repair. The values differ depending on the model, so before planning the installation location and wiring, you should find them in the operating instructions. Usually this:
- from 0.7 m from above the boiler;
- from 0.5 m on the sides (including to the pipeline) and below;
- from 0.7 m in front of the boiler unit;
- at least 3 cm between the wall and the boiler.
For example, the well-known Bosch Tronic Heat 3500 model requires only 0.6 m from the bottom and 0.2 m from the other sides. Any other additional installation requirements are always described in the operating instructions, which in almost all cases can be found in electronic form.
HOT WATER
Tariffs for hot water implemented by PJSC "Moscow United Energy Company" in the territory of the city of Moscow (with the exception of the Troitsky and Novomoskovsky administrative districts of the city of Moscow)
No. | Name of consumers | Tariffs for coolant, rub./cub.m | Tariffs for hot water, rub./cub.m |
1 | Population (including VAT) | 43,57 | 211,67 |
Tariffs for hot water implemented by PJSC "Moscow United Energy Company" in the Troitsky and Novomoskovsky administrative districts of Moscow
No. | Types of centralized hot water supply systems | Tariffs for coolant, rub./cub.m | Tariffs for hot water, rub./cub.m |
1 | Shcherbinka urban district | 35,21 | |
1.1 | for DHW systems with heated towel rails | 142,24 | |
1.2 | for DHW systems without towel rails | 142,24 | |
1.3 | for heating systems with heated towel rails | 142,24 | |
2 | The settlements Moskovsky, Vnukovskoye, Voskresenskoye, Desenovskoye (with the exception of the closed hot water supply system of the Vitermo boiler room), Mosrentgen, Sosenskoye, Filimonkovskoye | 43,57 | |
2.1 | for DHW systems with heated towel rails | 174,24 | |
2.2 | for DHW systems without towel rails | 174,24 | |
2.3 | for heating systems with heated towel rails | 174,24 | |
3 | Settlements Shchapovskoye, Klenovskoye | 39,29 | |
3.1 | for DHW systems with heated towel rails | 174,44 | |
3.2 | for DHW systems without towel rails | 174,44 | |
3.3 | for heating systems with heated towel rails | 160,14 | |
4 | Settlements Voronovskoye, Krasnopakhorskoye (with the exception of the Minzag subsidiary farm village), Mikhailovo-Yartsevskoye, Rogovskoye | 39,31 | |
4.1 | for DHW systems with heated towel rails | 171,11 | |
4.2 | for DHW systems without towel rails | 171,11 | |
4.3 | for heating systems with heated towel rails | 156,80 | |
5 | Desenovskoye settlements using a closed hot water supply system of the Vitermo boiler house | 45,29 | |
5.1 | for DHW systems with heated towel rails | 163,98 | |
5.2 | for DHW systems without towel rails | 163,98 | |
5.3 | for heating systems with heated towel rails | 163,98 | |
6 | Settlement Ryazanovskoye | 34,76 | |
6.1 | for DHW systems with heated towel rails | 161,08 | |
6.2 | for DHW systems without towel rails | 161,08 | |
6.3 | for heating systems with heated towel rails | 147.71 | |
7 | Settlements Kyiv, Pervomaiskoye, Novofedorovskoye, Kokoshkino, Marushkinskoye | 43.57 | |
7.1 | for DHW systems with heated towel rails | 202,78 | |
7.2 | for DHW systems without towel rails | 166,01 | |
7.3 | for heating systems with heated towel rails |
Order of the Department of Economic Policy and Development of the City of Moscow dated December 15, 2021 No. 314-TR Order of the Department of Economic Policy and Development of the City of Moscow dated December 15, 2021 No. 315-TR
Coolant
The use of high-quality coolant is the key to the normal functioning of engineering and climate control systems in public, residential and industrial facilities. Today there are a large number of working compositions for heating systems and climate control equipment on the market, but not all can be called reliable and effective. It is important not to prioritize the economic factor, but to select antifreeze based on the operating conditions of the equipment. A simple example: if relatively affordable boiler water is used in a heating system with a high risk of freezing, expensive equipment may become completely unusable. The costs of repairs and replacement of the used composition with a suitable coolant will be much higher. With such a variety of options, a logical question arises: where can you buy high-quality coolant in bulk? What performance characteristics of the mixture should you pay priority attention to and how to choose a trusted supplier?
RADIO POINT
No. | Services list | Payment amount including value added tax April 01, 2022 |
1 | 2 | 3 |
1. | Using the main subscriber radio point | 122 rub. 70 kopecks |
2. | Using an additional radio point | no fee |
3. | Disabling the radio point(*) | 61 rub. 02 kop. |
Heating schemes for a private house with an electric boiler
The simplest heating scheme for a private house with forced circulation by a heating element monoblock electric boiler, which already has an expansion tank, a circulation pump, a safety valve and an air vent.
Heating diagram for a private house with a simple electric boiler that does not have an expansion tank and a circulation pump.
A simplified diagram of using an electric boiler as a backup heating equipment in conjunction with the main boiler and buffer tank. The electric boiler can be used during the night zone with reduced tariffs, and during the day the buffer tank will release the accumulated heat for a long time.
Connection diagram for a double-circuit electric boiler.
Heating scheme with electric boiler and heated floors. Hydrocollectors are used to distribute heated floors into several circuits.
Acceptance
After all this work was completed, I called a geophysical laboratory to measure the grounding, wiring and circuit breakers. I paid about 80 rubles.
When I received the laboratory’s conclusion, I submitted an application for acceptance by energy supervision. The first one is free, but they say that you don’t have to pay for the subsequent ones either.
About a week later (I chose the date myself) I brought the inspector to the house. He examined everything carefully and, to my great surprise, said that it was not interesting to be with me, because there was nothing to complain about.
All that's left to do is wait for the acceptance certificate and connect everything to the power line. The act was ready in about 2 weeks. I immediately wrote an application to disconnect the old input to the house and connect two inputs: for heating and a new input to the house. I paid 156 rubles for this. On the appointed day, the team arrived and completed all the work in an hour, and also double-checked the correct assembly of the shields.
Shield for the house
INTERCOM
N p/p | Name of service (work) | Rub. per month |
1. | Intercom device maintenance | 64,00 |
2. | Maintenance of automatic locking device with electromagnetic lock | 48,00 |
3. | Maintenance of a mechanical combination lock | 27,00 |
Necessary conditions for designing electric heating
These conditions are:
- absence of any other types of heating - central, gas, solid fuel (stove);
- characteristics of electrical networks sufficient for increased consumer load (according to specifications);
- design of an electric heating system whose maximum power does not exceed the calculated wiring reliability indicators;
- act of disconnection from the central heating system, if one was present in the house/apartment previously.
If all conditions are met, you can proceed to the stage of preparing documents for a new tariff.
Design of electric heating - how to save?
For apartments with gas heating, the volume of electricity used over 100 kW per month is calculated at a rate of 1.68 hryvnia per kilowatt. Design and installation of electric heating allows you to pay for electricity only 90 kopecks per kilowatt, up to a volume of 3000 kilowatts per month from October 1 to April 30 inclusive. This norm was introduced by the Decree of the National Regulatory Commission for Electricity and Electricity, “On tariffs for electricity supplied to the population in populated areas” dated 03/01/2017.
The innovation immediately made it possible to reduce the estimated cost of electric heating by almost half. But that's not all. By the next resolution, dated October 1, 2017, NCREU provided the opportunity to switch to a special tariff “Electric heating”, the registration of which made the use of electricity even cheaper.